Gamsberg SIP
Supply of site infrastructure and resources for the Gamsberg Zinc Project
R34m
Jan 17 – Mar 20
Rhovan Leach Vat Project
Erection of 4 x leach vats, winch building & tailings conveyors
R37m
Jan 19 – Current
PJFF Maintenance
Maintenance of the dust handling plant at Medupi Power Station – Units 3 & 2 on emergency orders
R36.7m
Feb 19 – Jan 20
SAPPI Ngodwana
Erection of the balance of plant on a 25MW Biomass Power Plant
R59m
Jun 19 – Current
Transnet Saldanha Secondment
Supply of construction supervision and safety officer for the Saldanha Shiploader Project
R1.4m
Jul 19 – Feb 20
Small Projects Internal
Small projects to clients inside of ELB Group for the 2020 FY
R60k
Jul 19 – Current
Small Projects External
Small projects to clients outside of ELB Group for the 2020 FY
R1.1m
Jul 19 – Current
Medupi Silo 1 Maintenance
Maintenance on ash silo 1 at Medupi
R8.2m
Jan 20 – Current
Medupi Silo 2 Completion
Completion of CBZ work on ash silo 2 at Medupi
R4m
Jan 20 – Mar 20
Marageng
Refurbishment of stacker
R11.8m
Feb 20 – Current
Rhovan SRP
Supply a project manager to Rhovan mine to assist them with their internal projects
R1m
Mar 20 – Current
DHP Professional Services
Supply Professional Services to Trans-Africa Projects for the completion of Unit 1 DHP at Medupi
R8.7m
Jun 20 – Current
Medupi Unit 1 Completion – Tool, Equipment & Consumable Hire
Hiring of all required tools and equipment required for the construction and completion of the Medupi Power station Unit 1 Dust Handling Plant by (ERI)
R1m
Jun 20 – Current
2019
Medupi Terrace Coal and Ash
Erection of 54 coal and ash handling conveyors as well as a stacker/reclaimer
R354.5m
Jul 11 – Nov 19
Gamsberg Main
Erection of a zinc concentrator, including a crusher, sag & ball mill, floatation plant, thickeners, filter presses as well as all conveyor belts
R160m
Jun 17 – Feb 19
Gamsberg Piping
Low and high pressure piping for the Gamsberg Zinc Concentrator
R86m
Jan 18 – Jan 19
Medupi Operations and Maintenance
Operations & Maintenance of the coal feed conveyors to the boilers on an emergency order
R23.6m
Jul 18 – Aug 19
SAPPI SAICCOR
Erection of 2 x side arm chargers
R850k
Dec 18 – Mar 19
Small Projects External
Small projects to clients outside of ELB Group for the 2019 FY
R1.4m
Oct 18 – May 19
Ngodwana GSM
Supply of site infrastructure and resources for the Ngodwana Biomass Power Plant Project
R670k
Jan 19 – Jul 19
Cullinan Bogie Replacement
Replacement of bogies on the Petra Diamond Portal Reclaimer
R2.2m
Aug 19 – Oct 19
Kendal 3 Months Maintenance
Conveyor maintenance at Kendal Power Station
R13m
Apr 19 – Aug 19
SAPPI Shut Work
Maintenance on ash conveyors + bucket elevators
R645k
May 19 – May 19
Marageng
Erection of a Telestack telescopic stacker
R205k
Jun 19 – Jun 19
Matimba Maintenance
Ashe conveyor maintenance on the Matimba Power Station
R205k
Jun 19 – Jun 19
2018
Kendal 36 Month – Maintenance
3 year conveyor maintenance contract for the coal feed systems from the mine through to the coal storage bunkers at each boiler at Kendal Power Station
R41.2m
Jul 15 – Jul 18
Crane Hire Services
Project wide crane rentals on the Gamsberg Project
R9m
Jun 17 – Sep 18
Small Projects Internal
Small projects to clients inside of ELB Group for the 2018 FY
R76k
Oct 17 – Jun 18
Petra Diamond Portal Reclaimer
Replacement of portal reclaimer boom, sheaves & winch
R2.5m
Nov 17 – Jun 18
Medupi Piping
Fire water piping at Medupi Power Station
R3.7m
Nov 17 – May 18
Sedibeng DMS Plant
Erection of a DMS plant at Sedibeng Mine
R8.3m
May 18 – Oct 18
Nampak Cyclone Replacement
Replacement of mildsteel cyclones with VRN400 cyclones
R200k
Aug 18 – Aug 18
Small Projects Internal
Small projects to clients inside of ELB Group for the 2019 FY
R20k
Jul 18 – Sep 18
AEL-EVDS Zambia
Secondment of resources to ELB ES
R130k
Aug 18 – Aug 18
2017
Black Rock Project
Erection of a train loadout station incl the feed conveyor; 2 x stackers + stacker conveyors
R44.5m
Jun 16 – Nov 17
Multotec – Sampling Plant
Erection of a Multotec Sampling Plant at Kendal Power Station
R3.5m
Jan 17 – Jun 17
Small Projects
Small projects for 2017 Financial Year
R1.5m
Sep 16 – Jun 17
Petra Diamond Portal Reclaimer
Replacement of portal reclaimer boom, sheaves & winch
R3.5m
Mar 17 – Aug 17
Gamsberg – Head Office Setup
Supply of resources to EES
R160k
Dec 16 – May 17
Gamsberg – Site Early Works
Supply of resources to EES
R590k
Dec 16 – Jan 17
PPC Colleen Bawn Zimbabwe
Supply of construction supervision for the PPC Colleen Bawn Project
R830k
May 17 – Nov 17
Small Projects External
Small projects to clients outside of ELB Group for the 2018 FY
R68.5k
Aug 17 – Sep 17
2016
Sasol
Erection of 7 conveyors with a total length of 30km, incl a 27km overland conveyor and a 1km decline conveyor as well as a 15000t and 4000t coal bunker
R251.7m
Sep 12 – Aug 16
Secondment
Secondment of construction resources to a client
R860k
Mar 14 – Aug 16
Kendal – Ash Plant Maintenance
Emergency orders for the conveyor maintenance for the ash offsite storage systems at Kendal Power Station – typically ran for 6 months at a time
R5m
Dec 15 – Jun 16
Kendal – Inside Ash
Emergency orders for the conveyor maintenance for the ash onsite storage systems at Kendal Power Station – typically ran for 6 months at a time
R5.1m
Feb 16 – Jun 16
MHPSA – Bolting Crew
Torquing of bolts at Medupi Power Station
R6.7m
Feb 16 – Oct 16
Black Rock Offloading
Offloading, stacking & storage of all material for the Black Rock Project
R1.4m
May 16 – Jul 16
Mondi – Hot Splice
Splicing of a conveyor belt
R71k
Jun 16 – Jun 16
MAMMOET – Equipment Rental
Rental of mancages to Mammoet
R30k
Jun 16 – Jul 16
MHPSA – M4GAH Support
Medupi pre-heater erection for Unit 2
R6.5m
Jun 16 – Oct 16
Arnot Magnet Replacement
Replacement of a belt Magnet at Arnot Power Station
R290k
Jun 16 – Jul 16
Ngodwana – Sheeting Removal
Removal of sheeting at Ngodwana Biomass Boiler Project
R50k
Oct 16 – Nov 16
2015
Kumba (Sishen)
Erection of a Jig Tailings Modular Iron Ore Plant including 3 x 200 tph DMS modules complete with feed preparation, degrit and product and discard handling conveyors
R44m
Dec 13 – Jul 15
Kumba (Kolemela)
Erection of a Jig Tailings Modular Iron Ore Plant including 3 x 200 tph DMS modules complete with feed preparation, degrit and product and discard handling conveyors
R27.5m
Jan 14 – Jul 15
Eskom – Kendal (Maintenance)
Emergency orders for the conveyor maintenance for the coal feed systems from the mine through to the coal storage bunkers at each boiler at Kendal Power Station – typically ran for 3 months at a time
R10.2m
Oct 14 – Jun 15
Nestle – Estcourt
Erection of an Egron 5 High Volume Granular Coffee Plant
R69.5m
Aug 14 – Nov 15
Medupi – Maintenance
Conveyor maintenance on the boiler feed conveyors on Unit 6, 5 & 4
R1.5m
Aug 15 – Sep 15
2014
DIRO 001 (Naledi)
Erection of DMS Plants
R9.6m
Aug 13 – Oct 14
Matola
Boom extension of an existing ship loader to accommodate larger ocean going vessels
R1.7m
Jul 13 – Mar 14
Marley Pipes Extruder Plant 1
Repair and refurbishment of the extruder
R3.4m
Oct 13 – Mar 14
Marley Pipes Compound Plant
Modifications to plant and equipment in the compound plant
R2.1m
Dec 13 – Apr 14
Eskom – Kendal
Emergency orders for the conveyor maintenance for the coal feed systems from the mine through to the coal storage bunkers at each boiler at Kendal Power Station – typically ran for 3 months at a time
R5.9m
Mar 14 – Oct 14
PPC – De Hoek
Provision of resources to ELB ES for the erection of silo storage
R290k
Jun 14 – Nov 14
Matla – Filter Replacement
Replacement of bag filters and structure on top of the fine ash storage bunkers
R2.4m
Oct 14 – Dec 14
Sedibeng
Erection of a screening plant at Sedibeng mine
R800k
Oct 14 – Nov 14
2013
PPC Hercules
Changed out the C-Frame train tippler, supporting structures and building and the dust handling plant
R10.3m
Oct 11 – May 13
Goldfields
Installation of a pebble recrushing circuit into a brownfields operation
R5.6m
Nov 11 – Nov 13
Pepel
Resources supply for the refurbishment of shiploaders, installation of train tippler, stacker and associated conveyors
R2.6m
Dec 11 – Mar 13
Exstrata Thor Slurry Stacker
Installation of 2 x slurry stackers at Magareng mine
R1m
Oct 12 – Feb 13
Exxaro – Congo
Installation of an ELB Engineering Supplied DMS Plant in the Congo Republic (Project cancelled before start of Construction)
R1ook
Feb 13 – May 13
Transnet (PE)
Inspection of and replacement of wheels on a shiploader
R5ok
Jan 13 – Jul 13
Xtrata 70m Slurry Stacker
Reinforcing existing stacker at Magareng mine
R266k
Apr 13 – Aug 13
Goldfields Repair Work
Maintenance and modifications to the pebble crusher installation at Goldfields
R70k
Apr 13 – Apr 13
Snackworks
Replacement of a mixing vessel at the Eat-sum-more biscuit plant
R45k
Apr 13 – Apr 13
AEL – Kempton Park
Resources provided to ELB ES for modifications to the amonium nitrate storage shed stacker
R400k
Apr 13 – Aug 13
Komato (DRC)
Provision of resources to ELB ES for the erection of grasshopper conveyors
R800k
May 13 – Oct 13
DIRO 002 (Rust en Vrede)
Erection of DMS Plants
R2.88m
Jul 13 – Oct 13
Marley Pipes Repair
Site based installation of the refurbished extruder and associated plant
R210k
Sep 13 – Nov 13
ArcelorMittal
Stage and make-safe of the failed material storage bins for blast furnace D at ArcelorMittal Vanderbijlpark
R310k
Oct 13 – Dec 13
2012
Vele Colliery Project
Completion of a DMS, crusher and telescopic conveyors
R3.4m
Aug 11 – Jun 12
Mooiplaats Tank Repair
A repair of incorrectly designed tanks
R2.1m
Aug 11 – Jun 12
Ndola Lime
Supply of resources to refurbish Ndola Lime Plant in Zambia
R8.6m
Feb 12 – Aug 12
Samancor-Tubatse
Filter press and associated steelwork installation
R1.4m
Feb 12 – Aug 12
Samancor-Alloys
Filter press and associated steelwork installation
R1.1m
Mar 12 – Jul 12
2011
Mooiplaats Conveyer Repair
Recovery and repair of a canterlever feed conveyor structure in 2 weeks
R790k
Sep 11 – Sep 11
2020
Gamsberg SIP
Supply of site infrastructure and resources for the Gamsberg Zinc Project
R34m
Jan 17 – Mar 20
Rhovan Leach Vat Project
Erection of 4 x leach vats, winch building & tailings conveyors
R37m
Jan 19 – Current
PJFF Maintenance
Maintenance of the dust handling plant at Medupi Power Station – Units 3 & 2 on emergency orders
R36.7m
Feb 19 – Jan 20
SAPPI Ngodwana
Erection of the balance of plant on a 25MW Biomass Power Plant
R59m
Jun 19 – Current
Transnet Saldanha Secondment
Supply of construction supervision and safety officer for the Saldanha Shiploader Project
R1.4m
Jul 19 – Feb 20
Small Projects Internal
Small projects to clients inside of ELB Group for the 2020 FY
R60k
Jul 19 – Current
Small Projects External
Small projects to clients outside of ELB Group for the 2020 FY
R1.1m
Jul 19 – Current
Medupi Silo 1 Maintenance
Maintenance on ash silo 1 at Medupi
R8.2m
Jan 20 – Current
Medupi Silo 2 Completion
Completion of CBZ work on ash silo 2 at Medupi
R4m
Jan 20 – Mar 20
Marageng
Refurbishment of stacker
R11.8m
Feb 20 – Current
Rhovan SRP
Supply a project manager to Rhovan mine to assist them with their internal projects
R1m
Mar 20 – Current
DHP Professional Services
Supply Professional Services to Trans-Africa Projects for the completion of Unit 1 DHP at Medupi
R8.7m
Jun 20 – Current
Medupi Unit 1 Completion – Tool, Equipment & Consumable Hire
Hiring of all required tools and equipment required for the construction and completion of the Medupi Power station Unit 1 Dust Handling Plant by (ERI)
R1m
Jun 20 – Current
2017
Black Rock Project
Erection of a train loadout station incl the feed conveyor; 2 x stackers + stacker conveyors
R44.5m
Jun 16 – Nov 17
Multotec – Sampling Plant
Erection of a Multotec Sampling Plant at Kendal Power Station
R3.5m
Jan 17 – Jun 17
Small Projects
Small projects for 2017 Financial Year
R1.5m
Sep 16 – Jun 17
Petra Diamond Portal Reclaimer
Replacement of portal reclaimer boom, sheaves & winch
R3.5m
Mar 17 – Aug 17
Gamsberg – Head Office Setup
Supply of resources to EES
R160k
Dec 16 – May 17
Gamsberg – Site Early Works
Supply of resources to EES
R590k
Dec 16 – Jan 17
PPC Colleen Bawn Zimbabwe
Supply of construction supervision for the PPC Colleen Bawn Project
R830k
May 17 – Nov 17
Small Projects External
Small projects to clients outside of ELB Group for the 2018 FY
R68.5k
Aug 17 – Sep 17
2013
PPC Hercules
Changed out the C-Frame train tippler, supporting structures and building and the dust handling plant
R10.3m
Oct 11 – May 13
Goldfields
Installation of a pebble recrushing circuit into a brownfields operation
R5.6m
Nov 11 – Nov 13
Pepel
Resources supply for the refurbishment of shiploaders, installation of train tippler, stacker and associated conveyors
R2.6m
Dec 11 – Mar 13
Exstrata Thor Slurry Stacker
Installation of 2 x slurry stackers at Magareng mine
R1m
Oct 12 – Feb 13
Exxaro – Congo
Installation of an ELB Engineering Supplied DMS Plant in the Congo Republic (Project cancelled before start of Construction)
R1ook
Feb 13 – May 13
Transnet (PE)
Inspection of and replacement of wheels on a shiploader
R5ok
Jan 13 – Jul 13
Xtrata 70m Slurry Stacker
Reinforcing existing stacker at Magareng mine
R266k
Apr 13 – Aug 13
Goldfields Repair Work
Maintenance and modifications to the pebble crusher installation at Goldfields
R70k
Apr 13 – Apr 13
Snackworks
Replacement of a mixing vessel at the Eat-sum-more biscuit plant
R45k
Apr 13 – Apr 13
AEL – Kempton Park
Resources provided to ELB ES for modifications to the amonium nitrate storage shed stacker
R400k
Apr 13 – Aug 13
Komato (DRC)
Provision of resources to ELB ES for the erection of grasshopper conveyors
R800k
May 13 – Oct 13
DIRO 002 (Rust en Vrede)
Erection of DMS Plants
R2.88m
Jul 13 – Oct 13
Marley Pipes Repair
Site based installation of the refurbished extruder and associated plant
R210k
Sep 13 – Nov 13
ArcelorMittal
Stage and make-safe of the failed material storage bins for blast furnace D at ArcelorMittal Vanderbijlpark
R310k
Oct 13 – Dec 13
2019
Medupi Terrace Coal and Ash
Erection of 54 coal and ash handling conveyors as well as a stacker/reclaimer
R354.5m
Jul 11 – Nov 19
Gamsberg Main
Erection of a zinc concentrator, including a crusher, sag & ball mill, floatation plant, thickeners, filter presses as well as all conveyor belts
R160m
Jun 17 – Feb 19
Gamsberg Piping
Low and high pressure piping for the Gamsberg Zinc Concentrator
R86m
Jan 18 – Jan 19
Medupi Operations and Maintenance
Operations & Maintenance of the coal feed conveyors to the boilers on an emergency order
R23.6m
Jul 18 – Aug 19
SAPPI SAICCOR
Erection of 2 x side arm chargers
R850k
Dec 18 – Mar 19
Small Projects External
Small projects to clients outside of ELB Group for the 2019 FY
R1.4m
Oct 18 – May 19
Ngodwana GSM
Supply of site infrastructure and resources for the Ngodwana Biomass Power Plant Project
R670k
Jan 19 – Jul 19
Cullinan Bogie Replacement
Replacement of bogies on the Petra Diamond Portal Reclaimer
R2.2m
Aug 19 – Oct 19
Kendal 3 Months Maintenance
Conveyor maintenance at Kendal Power Station
R13m
Apr 19 – Aug 19
SAPPI Shut Work
Maintenance on ash conveyors + bucket elevators
R645k
May 19 – May 19
Marageng
Erection of a Telestack telescopic stacker
R205k
Jun 19 – Jun 19
Matimba Maintenance
Ashe conveyor maintenance on the Matimba Power Station
R205k
Jun 19 – Jun 19
2016
Sasol
Erection of 7 conveyors with a total length of 30km, incl a 27km overland conveyor and a 1km decline conveyor as well as a 15000t and 4000t coal bunker
R251.7m
Sep 12 – Aug 16
Secondment
Secondment of construction resources to a client
R860k
Mar 14 – Aug 16
Kendal – Ash Plant Maintenance
Emergency orders for the conveyor maintenance for the ash offsite storage systems at Kendal Power Station – typically ran for 6 months at a time
R5m
Dec 15 – Jun 16
Kendal – Inside Ash
Emergency orders for the conveyor maintenance for the ash onsite storage systems at Kendal Power Station – typically ran for 6 months at a time
R5.1m
Feb 16 – Jun 16
MHPSA – Bolting Crew
Torquing of bolts at Medupi Power Station
R6.7m
Feb 16 – Oct 16
Black Rock Offloading
Offloading, stacking & storage of all material for the Black Rock Project
R1.4m
May 16 – Jul 16
Mondi – Hot Splice
Splicing of a conveyor belt
R71k
Jun 16 – Jun 16
MAMMOET – Equipment Rental
Rental of mancages to Mammoet
R30k
Jun 16 – Jul 16
MHPSA – M4GAH Support
Medupi pre-heater erection for Unit 2
R6.5m
Jun 16 – Oct 16
Arnot Magnet Replacement
Replacement of a belt Magnet at Arnot Power Station
R290k
Jun 16 – Jul 16
Ngodwana – Sheeting Removal
Removal of sheeting at Ngodwana Biomass Boiler Project
R50k
Oct 16 – Nov 16
2012
Vele Colliery Project
Completion of a DMS, crusher and telescopic conveyors
R3.4m
Aug 11 – Jun 12
Mooiplaats Tank Repair
A repair of incorrectly designed tanks
R2.1m
Aug 11 – Jun 12
Ndola Lime
Supply of resources to refurbish Ndola Lime Plant in Zambia
R8.6m
Feb 12 – Aug 12
Samancor-Tubatse
Filter press and associated steelwork installation
R1.4m
Feb 12 – Aug 12
Samancor-Alloys
Filter press and associated steelwork installation
R1.1m
Mar 12 – Jul 12
2018
Kendal 36 Month – Maintenance
3 year conveyor maintenance contract for the coal feed systems from the mine through to the coal storage bunkers at each boiler at Kendal Power Station
R41.2m
Jul 15 – Jul 18
Crane Hire Services
Project wide crane rentals on the Gamsberg Project
R9m
Jun 17 – Sep 18
Small Projects Internal
Small projects to clients inside of ELB Group for the 2018 FY
R76k
Oct 17 – Jun 18
Petra Diamond Portal Reclaimer
Replacement of portal reclaimer boom, sheaves & winch
R2.5m
Nov 17 – Jun 18
Medupi Piping
Fire water piping at Medupi Power Station
R3.7m
Nov 17 – May 18
Sedibeng DMS Plant
Erection of a DMS plant at Sedibeng Mine
R8.3m
May 18 – Oct 18
Nampak Cyclone Replacement
Replacement of mildsteel cyclones with VRN400 cyclones
R200k
Aug 18 – Aug 18
Small Projects Internal
Small projects to clients inside of ELB Group for the 2019 FY
R20k
Jul 18 – Sep 18
AEL-EVDS Zambia
Secondment of resources to ELB ES
R130k
Aug 18 – Aug 18
2015
Kumba (Sishen)
Erection of a Jig Tailings Modular Iron Ore Plant including 3 x 200 tph DMS modules complete with feed preparation, degrit and product and discard handling conveyors
R44m
Dec 13 – Jul 15
Kumba (Kolemela)
Erection of a Jig Tailings Modular Iron Ore Plant including 3 x 200 tph DMS modules complete with feed preparation, degrit and product and discard handling conveyors
R27.5m
Jan 14 – Jul 15
Eskom – Kendal (Maintenance)
Emergency orders for the conveyor maintenance for the coal feed systems from the mine through to the coal storage bunkers at each boiler at Kendal Power Station – typically ran for 3 months at a time
R10.2m
Oct 14 – Jun 15
Nestle – Estcourt
Erection of an Egron 5 High Volume Granular Coffee Plant
R69.5m
Aug 14 – Nov 15
Medupi – Maintenance
Conveyor maintenance on the boiler feed conveyors on Unit 6, 5 & 4
R1.5m
Aug 15 – Sep 15
2014
DIRO 001 (Naledi)
Erection of DMS Plants
R9.6m
Aug 13 – Oct 14
Matola
Boom extension of an existing ship loader to accommodate larger ocean going vessels
R1.7m
Jul 13 – Mar 14
Marley Pipes Extruder Plant 1
Repair and refurbishment of the extruder
R3.4m
Oct 13 – Mar 14
Marley Pipes Compound Plant
Modifications to plant and equipment in the compound plant
R2.1m
Dec 13 – Apr 14
Eskom – Kendal
Emergency orders for the conveyor maintenance for the coal feed systems from the mine through to the coal storage bunkers at each boiler at Kendal Power Station – typically ran for 3 months at a time
R5.9m
Mar 14 – Oct 14
PPC – De Hoek
Provision of resources to ELB ES for the erection of silo storage
R290k
Jun 14 – Nov 14
Matla – Filter Replacement
Replacement of bag filters and structure on top of the fine ash storage bunkers
R2.4m
Oct 14 – Dec 14
Sedibeng
Erection of a screening plant at Sedibeng mine
R800k
Oct 14 – Nov 14
2011
Mooiplaats Conveyer Repair
Recovery and repair of a canterlever feed conveyor structure in 2 weeks
R790k
Sep 11 – Sep 11